Project Review Session

JSA Art 1 Lesson Plan Development

August 13, 2025 | Development Status Assessment

Review Type: Comprehensive Project Assessment

MCP Tools Used: Desktop Commander, Sequential-Thinking

Project Development Status

Completed Components
  • Main index.html (484 lines)
  • Professional CSS styling
  • 1st Six-Week Period (6 lesson plans)
  • Project structure & directories
  • Archive system established
  • STEAM integration framework
  • Texas TEKS alignment
Pending Development
  • Six-Week Periods 2-6 (detailed plans)
  • Complete assessment rubrics
  • Materials & supply lists
  • Resource material expansion
  • Student portfolio guidelines
  • Digital integration guides
  • Differentiation strategies
Overall Project Completion
20% Complete

Strong foundation established - ready for systematic expansion

File Structure Analysis

Main Directory Structure
📄 index.html

484 lines, comprehensive overview

Complete
🎨 css/styles.css

265 lines, professional styling

Complete
📚 units/

6 lesson plans (1st period)

Partial
📋 assessments/

1 overview file

Minimal
🔧 resources/

1 STEAM integration file

Minimal
📦 archive/

4 version files

Active
Units Development Status
1st Six-Week Period

Status: Complete

6 detailed lesson plans with 512+ lines each

2nd Six-Week Period

Status: Not Started

Principles & Techniques focus needed

3rd-6th Six-Week Periods

Status: Outlined Only

Framework established, detailed content needed

Recommended Development Path

🎯 Immediate Priority: 2nd Six-Week Period Development
Focus Area: Principles of Design & Media Exploration
  • Week 7: Emphasis and Focal Points
  • Week 8: Balance and Proportion
  • Week 9: Rhythm and Movement
  • Week 10: Unity and Variety
  • Week 11: Painting Techniques Introduction
  • Week 12: Printmaking Basics & Assessment
MCP Tools Integration Strategy:
  • Context7 MCP: Research latest art education standards and design principles
  • Desktop Commander: File management and lesson plan creation
  • Sequential-Thinking: Systematic planning for each week
Development Timeline

Phase 1: 2nd Six-Week Period

Phase 2: Assessment Rubrics

Phase 3: Resource Materials

Phase 4: Remaining Periods

Project Quality Assessment

Professional Standards

Excellent adherence to Texas TEKS, professional HTML structure, proper Bootstrap implementation

Grade: A
Technical Implementation

Proper file organization, responsive design, professional CSS, archive system

Grade: A-
Educational Content

Strong foundation established, excellent first unit, systematic approach needed for completion

Grade: B+

Review Summary & Next Action

Project demonstrates excellent foundation work with professional standards and strong educational framework. Ready for systematic expansion into the second six-week period.

Recommendation: PROCEED with 2nd Six-Week Period Development

Focus on "Principles & Techniques" unit with same detailed structure as 1st period. Utilize Context7 MCP for research, Desktop Commander for file management, and Sequential-Thinking for systematic planning.